Skip to content

News

RSS
  • Conveyor Pipe Feeder vs Cylinder Pipe Pusher: Which System Is Right for Your Project?
    May 28, 2026

    Conveyor Pipe Feeder vs Cylinder Pipe Pusher: Which System Is Right for Your Project?

    The key difference between a conveyor pipe feeder and a cylinder pipe pusher is continuous vs stroke-based movement. Cylinder systems stop and reset every 3–10 feet, creating static friction spikes that stress the pipe and destabilize the bore. The UNI-PF250 conveyor system moves the pipe without interruption — eliminating spikes, protecting pipe integrity, and reducing installation time on crossings of 20–56 inch steel pipeline.
    Read now
  • Pipeline River Crossing Methods: HDD, Microtunneling, Direct Pipe® & Pipe Jacking
    April 1, 2026

    Pipeline River Crossing Methods: HDD, Microtunneling, Direct Pipe® & Pipe Jacking

    There are four main trenchless methods for pipeline river crossings: HDD (fastest for crossings under 5,000 ft), microtunneling (best for grade-critical and hard ground), pipe jacking (for large diameters with crew access), and Direct Pipe® (one-step bore and install with TBM + pipe feeder simultaneously). The right method depends on pipe diameter, crossing length, and ground conditions. The UNI-PF250 pipe feeder supports all four.
    Read now
  • Large Diameter Steel Pipe Installation: Equipment Guide for 20–56 Inch Trenchless Projects
    March 24, 2026

    Large Diameter Steel Pipe Installation: Equipment Guide for 20–56 Inch Trenchless Projects

    Installing steel pipeline from 20 to 56 inches requires specialized equipment that scales to the forces involved — often exceeding 1,000,000 lbs of push or pull force on long crossings. This guide covers the three key equipment categories: pipeline-class HDD rigs, pipe feeders, and mud systems. The UNI-PF250 pipe feeder contributes up to 400,000 lbs (200 short tons) of supplementary push force and supports HDD pullback, microtunneling, pipe jacking, and Direct Pipe® tunneling.
    Read now